Windsor, Connecticut

Windsor, Connecticut

Refuse Derived Fuel (RDF) Power Generation Plant

Services Completed

Wolf Material Handling Systems provided system conceptual design, system technical specification, system design and equipment specifications, equipment design and engineering, fabrication and assembly of equipment, field modification of existing equipment and structures, field installation of new equipment, field electrical installation support and system start-up and performance certification.

Description

Wolf designed, engineered, and supplied complete metal recovery system to remove saleable ferrous and nonferrous metals from the conditioned mixed ash stream.

Scope of Work

The scope of this project included magnetic separator with chute modifications to existing unit, belt conveyors, vibrating feeders, Eddy current separator, and all associated chutework. Wolf also supplied structural steel modifications including structure, stairs, ladders and walkways, and complete electrical engineering package.